Supporting the single-source concrete formwork and shoring needs for the expansion of the Vogtle Power Plant by providing job-ready Logik 60, Logik 360, Lite formwork, GASS shoring and aluminum beams
Meeting tight timeline constraints
Georgia Power’s Vogtle Nuclear Power Plant Units 3 and 4 are part of the first nuclear expansion in the U.S. in over 30 years. HSG is supporting the single-source concrete formwork and shoring needs by providing job-ready Logik 60, Logik 360, Lite formwork, GASS shoring, aluminum beams and other miscellaneous formwork and shoring equipment. HSG is also providing a team of on-site engineers to readily respond to the dynamic challenges faced in a project of this scope. In addition, HSG is handling off-site equipment repair, maintenance, engineering design and detailing services to support the ongoing project demands.
Image: ©2015 Georgia Power Company. All rights reserved.